APplus
Detailed Planning in the ERP System
- Planning board: Displays orders, work steps, and KPIs at a glance.
- Sequence Planning: Optimizes setup times, capacity utilization, and scheduling.
- Forward Scheduling: shows overdue tasks and deadlines.
More than 1,800 small and medium-sized manufacturing companies use APplus · 98.5% customer retention rate

APplus detailed planning
Detailed planning software is an important tool for controlling and management. APplus offers you a pioneering solution that helps you plan your production processes – step by step and down to the smallest detail.
APplus detailed planning offers you

- Real-time operation
- Optimization of your production planning
- Numerous simulation options
- Adjustable planning horizons
- Optimal, residue-free planning

The planning tool at a glance
APplus Detailed Planning is a forward-looking, detailed planning tool with a holistic focus. It enables you to manage your company’s supply chain (as sequence planning according to defined rules). The detailed planning module can increase the benefits of manufacturing processes by precisely defining targets, constraints, alternatives and other characteristics.
The result: more transparent information and holistic optimization along the entire cross-company value chain.
Functionalities
- The detailed planning module is integrated into APplus. All planning-relevant elements and data – such as calendars, orders or resources – are provided.
- As the planning tool is integrated into the real-time operation of APplus, no interfaces are required.
- Simple and easy-to-use tools make interactive planning easier for you.
- Scheduling, generation of order proposals and other subsequent steps for all orders are automated.
- The visual display is in the form of a planning board – with information on orders, work processes and KPIs.
- Set-up times, sequence, capacity utilization and workstation occupancy are optimized.
- Overdue work steps and deadlines can be determined via forward scheduling and displayed graphically.
- Planning horizons can be set as required.
- Various filter functions provide a quick overview.
Pays off: Fast ROI
- No incompatible process concepts and data structures
- No duplication of functions and redundant master data
- Perfect coordination between business processes and production management
Frequently Asked Questions About Detailed Planning in APplus
APplus’s detailed planning automatically assigns all production orders to machines, workstations, employees, and tools, taking limited capacities into account. To do this, Asseco Solutions uses an APS (Advanced Planning and Scheduling) solution from a solution partner that has been integrated with APplus for over 17 years. The result is a feasible production plan with deadlines accurate to the minute.
The APS solution uses a standard interface to import all data from APplus that is important for planning, such as bills of materials, work plans, shop floor orders, shift models, and vacation schedules. Once the planners are satisfied with the results, the new start and end dates are automatically transferred back to APplus with the click of a button. This ensures that both systems are kept up to date with the same data.
APplus’s detailed planning module schedules machines, workstations, employees, and tools together and also checks whether the material is available. According to the solution partner, in many companies the bottleneck is not the machine, but qualified personnel. A qualification matrix therefore specifies who is authorized to set up or operate which resource, including validity dates for processes such as TIG welding.
Detailed planning in APplus optimizes production based on seven target criteria that can be weighted: the lowest possible setup costs, labor costs, production costs, capital tie-up costs, and lead times, as well as the highest possible capacity utilization and on-time delivery. The algorithm seeks the best overall result. In a real-world example, it accepted 600 euros in additional setup costs and thereby avoided 5,000 euros in delay costs.
Yes, planners can manually intervene at any time during detailed planning in APplus. They can move jobs to other machines, move them up in the schedule, split quantities among multiple machines, or group jobs together for parallel production. The algorithm no longer reschedules jobs that have been locked. Subsequent operations are automatically rescheduled accordingly.
Detailed planning in APplus uses a traffic-light system to flag orders in the control center: Red orders are behind schedule, and orange orders are only two days away from their delivery date. A planner analysis lists the reason for each delayed order and takes you directly to the order with a single click. A bottleneck overview also shows which resources are causing the delays.
In the scenario mode of detailed planning in APplus, planners can test changes using live data without altering the current production plan. Typical scenarios include an additional Saturday shift, switching to three shifts, adding a second bottleneck machine, or outsourcing to third-party manufacturers. The system can also calculate the impact of extended employee absences, including the redistribution of their orders.
APplus’s detailed scheduling determines the earliest realistic delivery date based on current capacity utilization. The system schedules simulation orders—which are generated directly from a quote in APplus—on a lower priority. A company with approximately 6,000 production orders discovered that the sales department had promised a twelve-week delivery time, even though production was already fully booked for 17 weeks.
Detailed planning in APplus uses a dynamic setup matrix. It determines how long it takes to change over between two items and groups orders with the same setup status. It schedules tools such as punching or injection molding dies as separate resources. If a tool reaches its maximum service life or production capacity according to the plan, the system alerts the user that maintenance is due.
According to the solution partner, 40 percent of customers report a 30 percent increase in efficiency thanks to automated detailed planning. One company reduced its manufacturing costs by 25 percent. Asseco Solutions and its partner have jointly implemented over 90 customer projects using APplus. Planners can view deadlines, capacity utilization, bottlenecks, and costs at any time.
According to our solution partner, the implementation of detailed planning in APplus typically takes between three and six months; over the past 20 years, the average has been seven months. With the Starter Edition, the project duration is no more than four months. It takes longer primarily when planning data—such as work plans—must first be prepared or when APS-specific settings, such as the setup matrix, must be developed.